Page 1 Page 1 Фігура_2_копія Фігура_3_копія Фігура_4_копія Page 1 Copy 3 PBS-logo-footer Group 28 Created with Sketch. Page 1 Page 1 Fill 1 Fill 1 Page 1 Page 1 Page 1 Combined Shape Fill 1 Fill 1 Page 1 Group Page 1 Fill 1 Rectangle 14 Rectangle 14 Copy Page 1 Page 1 Page 1 icons complete-icon location Page 1 Page 1 Copy 4 1StatusIcon 1StatusIcon 1StatusIcon Combined Shape Created with Sketch.

Dolyna-Khust road: lower asphalt concrete layer completed
Aug. 5, 2020
Dolyna-Khust road: lower asphalt concrete layer completed

The section between Torun and Verkhnii Bystryi has been finalized

P-21: repair project extended all the way to Mizhhiria
Aug. 4, 2020
P-21: repair project extended all the way to Mizhhiria

Operations are underway in villages Maidan and Soimy

Khust detour repairs completed
Aug. 3, 2020
Khust detour repairs completed

Road markings have been applied

Sivka Voinylivska bridge: carriageway asphalting completed
Aug. 2, 2020
Sivka Voinylivska bridge: carriageway asphalting completed

Road Т-09-10 Burshtyn - Kalush 

"PBS" to repair the Velykyi Bychkiv - Kobyletska Poliana road
July 31, 2020
"PBS" to repair the Velykyi Bychkiv - Kobyletska Poliana road

Operations are underway in Velykyi Bychkiv

М-19: main repair works completed
July 30, 2020
М-19: main repair works completed

The upper asphalt concrete layer has been arranged

"PBS" to repair the road in Solotvyno
July 29, 2020
"PBS" to repair the road in Solotvyno

The road is being repaired throughout the entire village

Previous
1 2 3 4 5 6 7 8 ... 62
Next