Temporary pillars are now being installed to strengthen the frame of the Deliatyn bridge. A total of six pillars are to be installed. Three of them are ready, three more to come tomorrow. These pillars will function as a basement for girders, which in turn will serve as mounting spaces for levelling cranes, in order to elevate the frame to the required level.