The Atamaniuk street has been prepped for road construction by PBS specialists.
"Right now we're digging the tube. We're also arranging the bottom layer with some 0-40 fraction crushed stone. Two streets are being prepared simultaneously", - Ihor Bondariev, PBS foreman.
The sewer collector has already been arranged, thus we may give ourselves completely to construction of a solid and long-lasting road structure.