Within 24 hours, "PBS" employees concluded 2.5 kilometers of the road with upper asphalt concrete layer. Both traffic lanes were being repaired simultaneously. The area of operation is the village of Usteriky, Verkhovyna district. The works are still underway: pedestrian lane and barrier fencing arrangement, roadside strengthening. In a couple of days, road markings we will be applied.
In the village of Rivnia, Verkhovyna district, the markings have been already applied. As a matter of fact, back in the day this road was used solely by locals: others preferred to take a detour route. Year by year, subject to funding being available, we gradually paved several new kilometers of this road. It is gratifying that we are now able to bring the state of the object to that of a regional significance road.