The construction of the bridge over the Prut river is in full swing in Marshyntsi, Novoselytsia district.
Major works are now being done on the approaches: geotextile canvas being installed on the right approach, with a solid layer of sand on top. On the left side, we deepen the road basis and prepare the area for similar operations.
In addition, we're attaching temporary structures to the main pillars. Soon we will start installating the primary beams.