Operational maintenance of the road Mizhhirya - Synevyr - Synevyrska Poliana continues. In Synevyrska Poliana we are arranging a layer of asphalt concrete, 5cm thick. For the past 24 hours, almost 1000 tons of concrete have been paved. At the same time, work continues on strengthening the banks and retaining walls.