"PBS" continues to repair the road P-21 Dolyna-Khust in the Ivano-Frankivsk region.
Almost 5 kilometers of the road from Myslivka to Vyshkiv, Dolyna district, have been milled. Simultaneously, additional gravel-sand mixture is being applied and the cold recycling road base regeneration is underway. 11,917 square meters of road have been already regenerated, which is more than 1 kilometer in length.
Shrubs are also being cut down and ditches are being deepened. Over four kilometers of the road has been cleared from overgrown bushes and more than three kilometers of ditches have been restored.
The work continues uninterrupted, which means that we will soon start pressing the first layer of asphalt concrete.