Temporary markings have been applied to the detour ring near Cherniiv. This is a roundabout on the road H-10 Stryi - Mamalyha within the Ivano-Frankivsk UTC. Here the road base has been reinforced with cold recycling technology and a leveling asphalt concrete layer has been arranged. The upper layer is planned to be paved next year. For the convenience of drivers, temporary markings were applied.
Markings have been also applied along the Ivano-Frankivsk detour, which passes through villages Cherniiv, Chukalivka and Drahomyrchany. Here, too, only the lower asphalt concrete layer was pressed, 10 kilometers in length. Future plans are to strengthen the roadside and arrange additional junctions. In 2021, repairs will be continued.