"PBS" is arranging the upper fine-grained asphalt concrete layer on Hrushevskyi street in Tlumach. Hatches and rainwater inlets have been raised to the new upper layer level, curbstones have been installed.
The length of the street is 850 meters. We simultaneously dismantled the side stone and removed the old road surface together with wet soils. Reinforced the road base with gravel and improved the drainage system. Then carried out the cold recycling regeneration and arranged a leveling layer of asphalt concrete.