"PBS" specialists have finished constructing the main driveway. The structure is now inseparable.
Primer substance has been applied for waterproofing.
Now mounting the metal structure formwork straightening for the pedestrian part of the bridge.
Bridge overhaul is being performed under the presidential program "The Big Construction".